|
|
|
|
|
|
Front Wall Goes Up 10/5/2007 |
|
Ground Floor Framed 10/15/2007 |
|
|
|
|
|
|
|
|
|
The Crane Arrives 10/24/2007 |
|
|
|
|
|
|
|
Hoisting the Ridge Beam 10/24/2007 |
|
Shimming the Ridge Beam 10/24/2007 |
|
|
|
|
|
|
|
|
Checking for Holes 10/24/2007 |
|
Placing the Sheathing 10/25/2007 |
|
Ready for Shingles 10/26/2007 |
|
|
Click on a picture to enlarge it.