Reminiscences of the Early Anthracite-Iron
Industry.
BY SAMUEL THOMAS, CATASAUQUA, PA.
(An Address at the California Meeting, September,
1899.)
THE
specimen of anthracite coal which I hold in my hand, insignificant as it may
appear to the casual observer, speaks volumes to me and to the initiated, as it
suggests and represents the entire evolution of the use of anthracite coal in
the manufacture of pig-iron, the growth and development of which it is my
purpose to review here to-day.
During
our recent visit to the Mountain Copper Co.'s works at Keswick, I picked up
this piece of coal from a pile of anthracite lying in the yard, asked Mr.
Edwards, the manager, a countryman of mine, where it came from, and, to my
surprise and delight, discovered that it had been brought all the way from
Wales, and had come out of the identical vein which my father opened near
Yniscedwin, about eighty years ago. I had no idea, before this incident, of
contributing to the already full and complete programme of the day; but, being
requested by our distinguished President and Secretary to do so, J consented to
relate here the story which this remarkable find naturally brought back to my
mind.
David
Thomas, my revered father, called by his Welsh countrymen "the pioneer of
the anthracite iron-trade in America," was one of the principal actors in
the history of manufacturing pig-iron with anthracite coal. I shall give here
my personal recollections of his early experiments, trials, and: final
successes, as frequently related by him to me, together with quotations from a biographical
sketch by E. Roberts, found in the number for October, 1883, of the "Red
Dragon," the, national magazine of Wales. Mr. Roberts' narrative is
authentic by reason of his free access to the records of the Yniscedwin
anthracite iron-works during his long connection with them. He says:
"Mr.
David Thomas was the only, son of David and Jane Thomas, of Tyllwyd, (Gray
House), in the parish of Cadoxtan, Glamorganshire, South Wales. Here he was
born November 3rd, 1794. David Thomas, his father, was one of the numerous poor
farmers of the country, but a man highly respected in his parish, where,
although a dissenter, be held the honorable office of church-warden in the
Established Church, and was overseer of the poor for sixteen years. Young
David's early religious and moral training was of the strictest kind, both as
regards example and precept; and he clung to these deeply inculcated principles
all through life. Being an only son, his parents were anxious to give him the
best advantages their means allowed, and the district afforded ; and be
attended school at Alltwen (White Grove), where he made such progress that,
when nine years old, be was removed to a more advanced school at Neath, his
father paying one guinea a quarter for tuition, which, at that remote period,
was considered a large amount The lad, studious by nature, delighted in books,
and in acquiring knowledge and information, and was determined to get on. He
soon outstripped all his school-fellows, and yet had succeeded in acquiring
only the elements of an education, as compared with the opportunities offered
the boys of today.
It
was by dint of undaunted perseverance, industry and personal effort that he
attained the prominent position to which he ultimately rose. David was often
called upon to assist in the operations of the farm ; but agricultural pursuits
were not to his taste, and his thirst for knowledge and improvement awakened in
him an ambition which small farming- interests failed to satisfy. In 1812, when
17 years of age, he determined to branch out in a line of life which presented
better prospects, and accordingly found employment at the Neath Abbey
iron-works, erected on the navigable river Neath. They consisted of two
cold-blast coke furnaces, machine-shops and foundry, owned by a fine old Quaker
gentleman named Price, who was one of the largest builders of mining-machinery
and Cornish pumping-engines of that day. Here young David spent five years;
acquiring his technical training in the machine-shops and foundry, while
devoting his leisure hours to the study of the workings of the blast-furnaces.
In 1817, when 23 years of age, after having spent several months in Corneal
erecting a pumping-engine, be went to the Yniscedwin iron-works, then owned by
Richard Parsons, and here was made general superintendent of the furnaces and
of tile coal- and iron-mines, which position he occupied for twenty-two years,
working the furnaces most successfully.
"
Some three years later, these works came under the control of George Crane,
after whom the Crane iron-works at Catasauqua, Pa., were named.
"
It so happened that the Yniscedwin works actually stood on the only basin of
anthracite coal in Great Britain, which contains several veins, and extends
from the upper part of the Vale of Neath in Glamorganshire, on the east, to
Saundersfoot in Pembrokeshire, on the west, the plant being on the southern
edge of the coal-field in the Swansea valley; and yet, although these furnaces
were underlain and surrounded with this valuable material, coke was brought a
distance of fourteen miles to supply them with fuel. Throughout this entire
basin the argillaceous clay-iron-stone and 'black band' are stratified, and
supplied the furnaces of that region with iron-ore.* Mr. Thomas was often heard
to say that the Almighty had not wasted His creative powers in putting these
materials together for no purpose ; and on that faith he began his experiments.
"As
early as 1820 Mr. Thomas began to experiment with anthracite coal in
the blast-furnaces, using it
with coke in the proportion of from 1 part in 20 to 1 part in 12. 'This did
very well,' Mr. Thomas used to say; I but whenever anything went wrong with the
furnaces the fault was always laid on the coal ; and the men became so prejudiced against it
that I had to give it tip. Still, every year I would try some experiments with
it, both in cupola and blast-furnace.' . . . 'In 1825 1 had a small furnace
built, 28 feet high and 9 feet bosh, which was put in blast with coke and an increased amount of anthracite.
Results were not satisfactory, and this furnace was abandoned. In 1830 the same
furnace was made 45 feet high and
11 feet bosh; and, while the experiments were much more successful than
previously, the consumption of coal was so great as to make results unprofitable,
and the work was again abandoned,'
*These
ores were long since exhausted; and every furnace in that region has been in
rains these twenty-five years and more.
Mr. Roberts continues:
"
About this time experiments were also being made in Pennsylvania, but with its
better success than in Wales. While this was being done on both sides of the
Atlantic, another brain was at work, which furnished the key that unlocked the
secret to success, by Mr. Neilson of Glasgow, the inventor of the hot-blast,
who in 1828 obtained a patent for his valuable invention, the importance of
which was not realized for a long time. The pamphlet on the hot-blast, issued
by Neilson, was eagerly read by Mr. Thomas, who was at once convinced of the
value of the discovery. One evening, while sitting with Mr. Crane in his
library, talking the matter over, he took the bellows and began to blow the
anthracite fire in the grate. 'You had better not, David,' said Mr. Crane; 'you
will blow it out.' And Thomas replied, 'If we only had Neilson's hot-blast
here, the anthracite would burn like pine.' Mr. Crane said, 'David, that is the
idea precisely,' and this idea both recognized as one which would bear working
out; and through Mr. Thomas's indomitable pluck and perseverance it succeeded.
In fact, this was the origin of the successful application of the hot-blast in
making iron with anthracite. In the meantime the Clyde iron-works, in Scotland,
had put a furnace in operation, using the hot-blast with semi-bituminous coal
in the furnace. Mr. Thomas urged upon Mr. Crane the immediate adoption of the
new discovery, and he was sent to Scotland to see how the process worked. After
the most careful examination, Mr. Thomas determined that the hot-blast was just
what was wanted for an anthracite furnace. He returned to Yniscedwin with a
license from Mr. Neilson, and an expert mechanic who understood the
construction of beating ovens, and at once proceeded to construct hot-blast
ovens, and erected them at the furnace which was known as the 'Cupola furnace,'
11 feet bosh by 45 feet high. The furnace was blown in, February 5, 1837; the
success was complete; and anthracite-iron continued to be profitably made from
said furnace without intermission.
"Anthracite-iron
was a new-born commodity in the commerce of the world, and David Thomas was its
godfather. The news of his success spread over the United Kingdom; the London Mining
Journal gave it great prominence ;
and an account of the discovery appeared in the press of the United States."
Fig.
1, copied from Truran's work on "Iron," shows the lines of the
"cupola furnace" mentioned in the historical summary quoted above.
In
May, 1837, Solomon W. Roberts of Philadelphia came to Yniscedwin, saw the
furnace in operation, and at once reported to his uncle, Josiah White, of the
Lehigh Coal and Navigation Company, the successful application of the hot-
blast there.* At this time, 1837-38, the Lehigh Coal and Navigation Company,
and other companies whose splendid mines cluster in the neighborhood of Mauch
Chunk, Pa., were experimenting in the use of anthracite in the blast-furnace,
but with such small success that
it was determined to send Mr. Erskine Hazard, one of the leading spirits of the
company, and afterwards the leading spirit of the Lehigh Crane Iron Company,
over to Wales, to investigate, the practice at Yniscedwin and engage a
competent person to come to this country to superintend the erection of
furnaces on the Lehigh. Mr.. Hazard arrived in November, 1838, and found the
furnace in full and successful operation.
Cupola Furnace," Built
at Yniscedwin Works, South Wale in 1836, and Successfully Blown-in, in
February, 1837.
Prior
to this date, my father had removed his family to Devynock for the better
education of his children; and there, in addition to his other duties, he
constructed a tramway to the mines and furnaces, the road-bed of which is
occupied to-day by the Swansea, Neath and Brecon railroad. Mr. Crane brought
Mr. Hazard to our home, near Castle Dhu (Black Castle), a feudal ruin of the twelfth
century. He was accompanied by his oldest son, Alexander Hazard, at present, a
resident of Catasauqua, Pa. Here took place the first interview with my father
with in relation to his going to America, Mr. Crane having strongly recommended
him to Mr. Hazard as the only man who would answer the purpose. My father was
very loath to leave his native land, chiefly on account of his aged mother; but
at the persuasion of his ambitious and energetic wife, who felt that the new
world held larger opportunities for her three sons, he entered into the
following agreement, which was executed the last day of the year 1838. All the
details of this transaction I remember distinctly, having, been present on the
occasion:
*Mr.
Roberts was then located at the Dowlais iron-works, WaIes, inspecting rails for
his company, which was constructing a railroad between White Haven and
Wilkesbarre. These rails were double-beaded. About thirty-five years later the
writer, then President of the Catasauqua Manufacturing Company, bought a
quantity of these identical rails, which were rolled into spike-rods.
Memorandum of Agreement
Made the Thirty-first Day of December, 1838, between Erskine Hazard for the
Lehigh Crane Iron Company of the One Part, and David Thomas, of Castle Dhu, of
the Other Part.
1.
The said Thomas agrees to remove with his family to the works to be established
by the said company on or near the River Lehigh, and there to undertake the
erection of a blast-furnace for the smelting of iron with anthracite coal, and
the working of the said furnace as furnace-manager; also to give his assistance
in finding mines of iron-ore, fire-clay, and other materials suitable for
carrying on iron-works, and generally to give his best knowledge and services
to the said company, in the prosecution of the iron business, in such manner as
will best promote their interests, for the term of five years from the time of
his arrival in America, provided the experiment of smelting iron with
anthracite coal should be successful there.
2.
The said Hazard, for the said company, agrees to pay the expenses of the said
Thomas and his family from his present residence to the works above mentioned
on the Lehigh, and there to furnish him with a house and coal for fuel also to
pay him a salary at the rate of two hundred pounds sterling a year from the
time of his stipend ceasing in his present employment until the first furnace
on the Lehigh is got into blast with anthracite coal. and making good iron,
and, after that, at the rate of two hundred and fifty pounds sterling a year
until a second furnace is put into operation successfully, when fifty pounds
sterling shall be added to his annual salary, and so fifty pounds sterling per
annum additional for each additional furnace which maybe put into operation
under his management.
3.
It is mutually agreed between the parties that should the said Thomas fail of
putting a furnace into successful operation with anthracite coal, that in that
case the present agreement shall be void, and the said company shall then pay
the said Thomas a sum equivalent to the expense of removing himself and family
from the Lehigh to their present residence.
4.
In settling the salary, four shillings and sixpence sterling are to be
estimated as equal to one dollar.
In
witness whereof the said parties have interchangeably set their hands and seals
the date above given.
ERSKINE
HAZARD, (SEAL)
for
Lehigh Crane Iron Comp'y.
DAVID
THOMAS. (SEAL)
Witness
ALEXANDER F. HAZARD.
It is further mutually agreed
between the Lehigh Crane Iron Company and David Thomas, the parties to the
above-written agreement, that the amt. of the D. Thomas salary per annum shall
be ascertained by taking the United States Mint price or value of the English
sovereign as the value of the pound sterling, Instead of estimating it by the
value of the dollar as mentioned in the 4th article, and that the other
remaining article in the above-written memorandum of agreement executed by
Erskine Hazard for the Lehigh Crane Iron Co. and David Thomas be hereby ratified
and confirmed as they now stand written.
This supplementary agreement
was also duly executed.
The
organization of the Lehigh Iron Co., prior to Mr. Hazard's going abroad, had
been only an informal one. On Jan. 10, 1839, it was perfected, and the first
meeting of the directors was held. The Board consisted of Robert Earp, Josiah
White, Erskine Hazard, Thomas Earp, George Earp, John McAllister, Jr., and
Nathan Trotter. They organized by electing Robert Earp President and Treasurer,
and John McAllister, Jr., Secretary. In April they entered into articles of
association, which are appended, as affording some idea of the foundation on
which this staunch old company has arisen and flourished.
Articles of Association of
the Lehigh Crane Iron Co., Made and Entered into Under and Pursuant to an Act
to Encourage the Manufacture of Iron with Coke, or Mineral Coal, and for Other
Purposes, Passed June 16, 1836.
WITNESS that the subscribers,
citizens of Pennsylvania, whose names are hereto affixed, have associated
themselves, under and pursuant to the Act aforesaid, for the purpose of making
and manufacturing iron from the raw material with coke or mineral coal, and do
certify and declare the articles and conditions of their association to be as
follows :
Article
1. The name, style, or title of the company shall be Lehigh Crane Iron Co.
Art.
2. The lands to be purchased by the company shall be in Northampton, or Lehigh
county, or both.
Art.
3. The capital stock of the company shall consist of one hundred thousand
dollars, divided into two thousand shares of fifty dollars each, the whole of
which bas been subscribed for by the subscribers hereto, in the numbers of
shares set opposite to their respective names.
Art. 4. The sum of
twenty-five thousand dollars, being the one-fourth of the whole capital stock
subscribed for, has been actually paid in.
Art.
5. The remaining installments on the stock, already subscribed for, shall be
called in such sums, and at such times, and with such forfeiture for
non-payment thereof, as the Board of Directors may prescribe.
Art.
6. The Board of Directors' shall consist of such a number of persons as the
stockholders may from time to time prescribe.
Art.
7. This company shall in all things be subject to and governed by the provisions
of the Act of Assembly under which it is created, and shall have the same and
no other or greater powers, privileges, and franchises than are conferred upon
it by virtue of the said Act.
PHILADELPHIA, April 23, 1839.
Signed JOSIAH WHITE, JOHN McALLISTER, JR.,
ERSKINE
HAZARD, ROBERT
EARP,
THOMAS
EARP, THEODORE
MITCHELL,
GEORGE
EARP, NATHAN
TROTTER.
The
first week of May, 1839, found our little family group at Swansea, on board of
one of the coast-steamers on our way to Liverpool, as there were no railroads
across the country at that time. The steamer "Great Western" had made
but two or three voyages across the Atlantic; so, after much discussion among
the parties interested, it was decided that, as steam was still considered a
dangerous venture, we. should take a sailing-vessel; and our passage was
engaged on the clipper ship "Roscius" commanded by Captain Collins,
cousin of E. K. Collins, of the celebrated line of steamers of that name. The
"Roscius" and the "Great Western" left port on the same
day; the steamer arriving in New York but four days in advance of the clipper,
which had an unprecedented voyage of twenty-three days. Our first month on
American soil was spent in New Brighton, Staten Island, where my father lay
very ill of a fever, and was faithfully attended by Dr. Harcourt, the genial
quarantine-physician. On his recovery, he took me with him to Philadelphia,
where he had been called to attend a meeting of the Crane Co.'s Board, relative
to his entering upon his duties. We returned to New Brighton July 4, and two
days later turned our faces toward the Lehigh Valley, our future home, taking
the New Jersey railroad via Jersey City and New Brunswick,-at that time the
terminus of the road, which, it may be of interest to note, was laid with
strap-rails.
.From
New Brunswick the journey was continued by stage, the first night being spent
at Easton, and Allentown being reached July 9. Here we resided four months
while our home was being built near the new works. On July 11 my father and I started
on foot for the site of the future works, near what was-then known as Biery's
bridge, where we spent several hours, making measurements from which to work
out plans for the construction of the plant. - I, then a boy of thirteen
carrying one end of the tape-line. About August 1, surveys and plans being
completed, work was commenced on excavations for the foundations of the
wheel-pit, and on a branch canal,
25 feet wide, which was to be the feeder or race-way -to the water-wheels, and
also the route for boats to bring material to the works. The excavation was
under the charge of Robert McIntyre and William Paul. A little later, the
hot-blasts and furnace-foundations were commenced; the furnace being some 30
feet square at the base, 12 feet bosh, and 45 feet high. lines are shown in
Fig. 2. All the masonry was laid by Isaac McHose, Sr., of Rittersville, whose
son Samuel was subsequently the builder of nearly all the furnaces in the
Lehigh Valley. The hot-blasts, with the usual bed-pipes, consisted of four
ovens of 12 arched pipes each, 5 inches interior diameter, 1-1/2 inches thick in the legs and 2 inches
thick in the arch. They were built on the ground and fired with coal, having
deep closed ash-pits, into which blast was introduced for active combustion, in
lieu of a draft-stack. The arch-pipes were not connected with the nozzles on
the bed-pipes by a socket and rust joint, as in later years. The joints were
made with liquid cast-iron, the point of junction on the arch-pipes and nozzles
on bed-pipes being carefully luted to prevent the iron from running into the
bed-pipes. A pattern in three parts one inch thick, corresponding to a socket,
was placed against the pipe and nozzle with sand packed around it, and when
drawn out left a space into which the iron was poured. On the side of two
pieces of the pattern was a hub in which was placed a core of the depth of the
socket, for the purpose of driving a steel pin, to split it in renewal of
pipes. Melting the iron was done in a small movable cupola placed at the end of
the ovens and blown by hand with a very large blacksmith bellows; and the
melted iron was carried in small hand-ladles to pour the joints. After the
joints were made, they were deluged with salt and sal-ammoniac water, which
rusted them perfectly tight. This plan was followed for several years. There
were diaphragms in the bed-pipes, diverting the blast through three pipes from
side to side; and, with good firing-, a temperature of 600 deg was easily
obtained; but, generally speaking - that was not maintained The elevator for
filling the furnace, called "a water-balance" consisted of two square
boxes of sufficient size, one on each end of a chain, passing over a large
wheel with a brake; a sufficient amount of water being admitted -into the. boxes
on top to bring up a load on the other side, while the water escaped out of the
boxes automatically at the bottom. No. 1 furnace was blown by a breast-wheel 12
feet in diameter and 24 feet long; the fall of 8 feet between the canal levels
at lock 36 furnishing the power.
Fig. 2 Furnace
No. 1, Built at Catasauqua, Pa., 1839-40.
On each end of the wheel were
segments on its circumference, of 10-inch face, geared into pinions on double
cranks, these driving two blowing-cylinders having 5 ft. diameter and 6-ft.
stroke, with parallel motion, and worked by beams on gallows-frames. The beams
were constructed of two pieces each of white-oak timber, 14 by 16 in. in the
center, and tapering towards the ends; the beams being also trussed with
1-1/2-inch rods. The center-shaft of cast-iron, with extension plate and
flanged, was fitted between the timbers; and at the end heavy cast-iron
spade-handles were also fitted between the timbers, for coupling the
connecting-rods and links, all firmly bolted together, as shown in Figs. 3, 4
and 5. The blast from the cylinders was conducted underneath the canal through
an 18-inch cast-iron pipe; this being the only receiver, the strokes of the
cylinders could be counted at the furnace-tier as easily as in the wheel-house.
(The wheel-wrights who did the work were "Squire" George Frederick,
with his sons, Thomas and Nathan, Edward Scherer, Thomas Barber, and John
Leibert, father of Owen and Henry, now at the Bethlehem Steel Works). About
mid-summer of 1839, such portions of the outfit for this furnace as had been
constructed on the other side of the Atlantic were shipped (Some castings being
made here later on), except the two blowing-cylinders, which the hatches of the
ship were too small to admit. The vessel was also laden with rails for the
Lehigh Coal and Navigation Co., and cleared for Philadelphia; but, having
sprung a leak, she put into Norfolk, Va., in distress, after having jettisoned
about 300 tons of the rails. On receipt of this news, Mr. Hazard and my father
went to Norfolk and, to their consternation, found the cylinders were not
there; the captain telling them, in language more forcible than elegant, that
if the castings in the hold had not been so heavy they would have gone
overboard also. After necessary repairs, the vessel proceeded to Philadelphia;
and thence all the material for the furnace was shipped by canal to the works.
Steps were taken at once to procure cylinders. Application was made to Alger at
Boston; the Allaire works, and the Morgan iron-works of New York; but they all
declined to undertake the work, as they could not bore cylinders of that size,
and would not enlarge their mills for the purpose.
At
this time there was not a boring-mill in the United States large enough to bore
a cylinder of. 60 inches diameter; but American progress in the construction of
machinery was so rapid that in 1851 the I. P. Morris Co. of Phila., Pa., made
four cylinders for Ericsson's hot-air ship of 168 inches diameter and 6 feet
stroke.
Fig 3. Water-Power Blowing Engine, Crane Iron-Works,
Catasauqua, Pa. Erected 1839-40. Vertical Longitudinal Section. Scale: 1/8-in =
1 ft.
Application
was then made to Merrick & Towne of the Southwark foundry, Philadelphia,
who agreed to undertake the work, enlarging their boring-mill for the purpose,
and succeeded in making two very fair cylinders, for which 12-1/2 cents per
pound was paid. These cylinders were bored by Harry Smith, who fitted them to
the tops and bottoms sent from England and subsequently erected them in place.
Fig 4,.
Vertical Cross-Section of Fig. 3.
Scale: 1/8 in.. = l ft..
The original cylinders, which had been so unceremoniously left on the docks at Cardiff, finally arrived at their destination in 1840. They were unloaded at lock 36, and one of them figured in the great flood of 1841, being rolled by the water a quarter of a mile down to Biery's bridge, where it lodged in a deep gully. Later, these cylinders were used in the construction of two blowing engines, which were erected back of No. 1 furnace.
Fig. 5 Plan of Blowing-Engine, Fig 3. Scale: 1/8 in. =
1 ft.
They were in use there several years, and were then taken
down, to make room for the present railroad back of the furnace. About 1866,
the Lockridge Iron Co. was organized at Alburtis. I purchased these engines and
erected them at the first furnace built there. The Lockridge Co. was later
merged into the Thomas Iron Co., and these historical cylinders are in use by
the latter Co. to-day.
After
this long digression, I return to the history of the construction of the works.
That all beginnings are hard, was never better illustrated than in this
instance. Delays, difficulties and discouragements sprang up on every side, not
least among which was the second serious illness of my father, keeping him
housed during weeks in the autumn and greatly impeding the progress of the
work, which he directed as best he could, using me as messenger to those in
charge. The want of foundry facilities was one of the greatest difficulties
encountered; but finally the large cast-iron centerpieces, segments, gudgeons
and pinions for the water-wheel were made at the Allentown Foundry, owned by
George Brobst and Stephen Barber. It was at their foundry that the first
steam-engine in Lehigh county was erected. It is preserved as a curiosity on
the campus of Lafayette College at Easton, Pa.
After
many vexatious delays, the furnace was completed and successfully blown in at 5
o'clock P. M. July 3, 1840, and the first cast of about 4 tons of iron was made
on the memorable 4th of July of that year, the keepers in charge of the furnace
being William Phillips and Evan Jones.
Looking
back on those primitive times, I recall things which, done to-day, would seem
ridiculous. For example, to prepare a furnace for blowing-in, a process called
"scaffolding" the furnace was performed. The front or neck of the
hearth was open, without the dam-plates. Across the knees of the buck staves
was thrown a bar of iron; and, over this and under the tymp, long heavy bars
called ringers were driven several
feet into the material in front, these bars holding it up, while below, all the
clinkers and ashes that could be reached were shoveled and scraped out of the
furnace; the dam-plate and harp were then put in place, and the bars were drawn
out, allowing the front to fill up with fresh live coal. The plate called the
harp was a long tapered plate with teeth like that of a saw, fastened against
the dam-plate, and used to hold up the cinder-fall. The distance between the
dam-plate and the tymp was about 24 inches. The blast-pressure being so light
it was not necessary to hold the plate down with props under the mantel, as in
later years.
During
the construction of the works, mines necessarily had to be opened for the
supply of iron-ore. The first of these wag Rice's mine, near Schoenersville,
Hanover township. The first load of ore brought to the works was hauled from
that mine by Henry Hoch. In the same neiohborhood Goetz's and Daniel's mines
were opened, and others in North and South Whitehall townships. The magnetic
ore came from the Irondale, Byram and Dickerson mines in New Jersey, small lots
being purchased from each place and shipped by the Morris canal. The proportion
of ores generally used was one-fourth magnetic and three-fourths hematite. The
furnace remained in blast until its fires were quenched by the rising- waters
of the Great flood of January, 1841, a period of six months, during which 1080
tons of pig-iron were produced. The largest output for one week was 52 tons.
Concerning the flood which I have mentioned, one of the Company's old books
contains the following in my father's handwriting:
"On
Thursday, January 7 (1841), at 9 o'clock in the evening, the river rose so that
the back-water prevented the wheel from turning; at half after 10 covering the
tow-path of the level above Lock 36. At 12 it was 2 feet over the banks and 1
foot over the bottom of the hearth of the furnaces. At 1:20 the water was at
its height, and 34 inches in the furnace, It was at this height until 3.30
o'clock, when the river began to fall. The water-wheel was muddied all over,
and the water lay 9 inches over its top. The dam and canal-bank were broken, so
that when the water fell in the river it was too low to turn the wheel, though
every effort was made to fill up the banks, with no good result, and we were
obliged to throw out (shovel) the furnace on Monday, the 11th of January.
"DAVID
THOMAS,
THOMAS
S. YOUNG (Bookkeeper)."
Furnace
No. 1 was blown in again after the freshet, May 18, 1841, and then remained in
blast until August 6, 1842, producing 3,316 tons of pig-iron. My father had
been very generally looked upon as visionary. The remark made by a leading
charcoal-iron master, whom I well knew, "1 will eat all the iron you make
with anthracite," gave expression to the general sentiment of the trade at
that time. It is needless to say that he did not keep his promise, although my
father cordially invited him to a hearty dinner, cooked in the company's first
furnace.
After
the success of this furnace bad been fully established, anthracite-furnaces
began to multiply rapidly; Post built at Stanhope, N. J., Henry at Scranton,
Firmstone at Glendon, Governor Porter at Harrisburg, Dr. Eckert at Reading; and
by 1846 there were about 40 anthracite-furnaces in the country, distributed on
the Lehigh, Hudson, Schuylkill and Susquehanna rivers.
In
the latter part of 1841 the Crane company determined to build No. 2 furnace,
and preparations were made accordingly. The furnace was built in the summer of
1842, and blown-in in November of the same year. It was 34 ft. at the base, 13
ft. 4 in. bosh, and 45 ft. high. The lines are shown in Fig. 6. The hot-blast
was placed on top, additional space being provided by making the back of the
furnace vertical for 25 feet, instead of giving it the usual batter. All the
masonry, both brick and stone, was laid by David Walters, who had previously
built a furnace at Farrandsville, Pa. (He was a most excellent mechanic, with
peculiar ideas of his own: for instance, he prevailed on my father to allow him
to put in the lining-brick of No. 2 furnace in spiral instead of horizontal
lines; and inasmuch as one way was about as good as the other, my father gave
his consent.)
The blowing-apparatus for this furnace bad 2 horizontal cylinders of 5-ft. diameter and 6-ft. stroke, driven by 2 Fourneyron turbines of 8-ft. outside diameter and 15-in. depth of bucket. On the upper end of the turbine-shafts was a 30-in. pinion geared into a heavy horizontal cog-wheel of 8-ft. diameter and 10-in. face, in which were inserted the crank-pins, and to these were coupled the necessary connecting-rods and cross-heads to drive the cylinders. Each machine was separate and was operated independently. All this machinery was made by Merrick & Towne, Southwark Foundry, Philadelphia. The blast was conducted to No. 2 furnace through the same pipe, under the canal, as to No. 1. The turbines proving great consumers of water, it became necessary to construct another canal as a feeder; the current in the old canal being so great that it was almost impossible to tow a heavily-loaded boat against it, so that the water on the water-wheels frequently had to be checked, to permit boats to pass, through. A large force of men under Samuel Glace was put on the construction of the second canal, which was located on the south side of the old canal, and completed in four months.
Fig 6. Furnace No. 2, Built at Catasauqua, Pa, in 1842
The canal is therefore double at Catasauqua - a fact which has excited the curiosity of many. To protect it against floods, a cinder-bank was deposited on the outside, and upon this the Lehigh & Susquehanna Railroad is now laid, from the guard-lock at Hartman dam to Catasauqua station.
In
1843 an experiment was tried at this furnace-the first, I think, of the kind in
this country-with the aim of utilizing the waste-gases for refining iron,
taking- out the gas at a depth of some 9 ft. below the top of the furnace.
Previously the gases used for steam and hot-blasts had been taken out
immediately under the dumping-ring at the tunnel-head. The practical purpose of
the experiment was the refining, and puddling of iron for making an extra
quality of bar-iron and wire. I quote from the furnace charging-book the
following in my father's handwriting, under date of October 23, 1843:
"On
Monday night at 12 o'clock the blast was stopped on the furnace to build up
gas-flues; there was 11-1/2 inches of the backing of the furnace taken out,
which was all calcined into lime." (The masonry of the furnace was
limestone.) " The blast was put on again Saturday morning, October 28th,
at 1 o'clock in the morning."
The
construction of this refinery was very similar to that of a puddling-furnace.
The gas was brought down through a conduit built of brick against the side of
the furnace and conducted into one end of the refinery, passing over a
bridge-wall into the body of the refining-furnace, which was built in a
circular form, and on one side of which were inserted two tuyeres at an angle,
to deliver the blast into the molten iron. Immediately back of the bridge-wall
there were some 10 or 12 1-in. pipes, contracted at the tips, through which
hot-blast was blown into the gas as it passed over the bridge-wall. So long as
the material which went into the furnace was dry, the gases came down at a high
temperature, and the heat was intense and melted the iron very readily. After a
rain, however, the wet material going into the furnace so reduced the
temperature of the gases in the flues that it was insufficient to melt the
iron. When successful beats were made, the metal was tapped into iron-chills
about 3 ft. wide and 8 or 10 ft. long, making a plate 1 or 2 in. thick; and as
soon as the iron was set it was deluged with water and broken up for shipment.
Owing to the irregularity of the temperature of the gas, however, not more than
50 tons of metal were made in the six weeks of trial, and the experiment was
abandoned as unprofitable. It was tried under the supervision of C. E. Detmold,
an eminent engineer from Lippe-Detmold, Germany, a most genial man, of broad
education and intellectual resources, whose name is associated with various
important works and surveys in this country, among others the laying of the
foundation of Fort Sumter, of historic memory. (Mr. Detmold was, at this time,
the agent of Faber du Faur, inventor of the method of utilizing the waste gases
of blast-furnaces.). He assigned to superintend this experiment young Edward S.
Renwick, of the distinguished family of architects and mechanical engineers of
that name, who, with his brother, subsequently built and owned a blast-furnace
at South Wilkesbarre, Pa.
In
1844 the blowing-apparatus was reconstructed. As the blast to both furnaces was
blown in common, the turbine-wheel proved so much more powerful that we could
not get the necessary service from the breast-wheel. So the pinion and the
double crank were abandoned, and the forebay to the first breast-wheel was
shortened 8 ft., moving the wheel forward, which brought the center of the
wheel directly under the point of the beam. We replaced the original gudgeon
with one of 14-inch diameter, on which the crank-wheel was placed, connecting
it with the original connecting-rod. To this was added another wheel, the same
as the first, and they were geared together as shown in Figs. 7, 8, and 9. This
gave us a blowing-apparatus fully equal to the turbine.
In 1845 it was determined to build No. 3 furnace; and the question at once came up, what power should be used for blowing. I well remember a consultation held on this subject at the Catasauqua office by Messrs. White, Hazard, E. A. Douglas, Engineer-in-Chief of the Lehigh Coal and Navigation Co., and my father. Mr. White was a great stickler for water-power, and almost insisted upon its being used. Mr. Hazard and my father were in favor of using steam-power, maintaining that there was not water enough in the Lehigh during the dry season to blow an additional furnace. The discussion grew quite earnest, and Mr. White somewhat impatiently said to my father, "David, thee does not know what thee is talking about;" but as Hazard and Douglas coincided with my father, steam-power carried the day.
Fig 7 Blowing Engines for Furnaces Nos. 1 and 2, as reconstructed in
1844.
Scale: 1/8 in. = 1 ft.
No. 3 furnace (see Fig. 10) was 40 ft. wide at the base, 17 ft. in bosh-diameter, and 47 ft. high, and was fitted with a water balance, like the other furnaces. It was blown by a pair of beam-engines connected with a single fly-wheel; the blowing cylinder was 5-1 ft. in diameter and 6-ft. stroke; the steam cylinders had 26-in. diameter and 6-ft. stroke, with slide-valve and a cutoff.
Fig. 8. Vertical Cross-Section of Fig. 7. Scale: 1in.
= 1 ft.
A pressure of about 6 lbs. could be maintained, and with that the furnace did fairly well. These engines were built, at the Allaire works, New York, and a Mr. Smith was the engineer in charge of construction.
Fig. 9 Plan of Fig. 7,
Scale: 1/8 in. = 1 ft.
Fig. 10 Furnace No. 3, Built at Catasauqua, Pa., in 1845-6.
In 1847 an experiment was tried at this furnace by passing a strong current of electricity through the molten iron, the battery for which consisted of 100 cells, very powerful and dangerous to handle. A heavy iron bar, with a heavy wire attached, was placed in the runner at the end of the casting-trough, and a second wire and bar were attached at the extreme lower end of the pig-bed, the current being maintained while the iron was flowing and for twenty minutes after the iron was set. This was carried on through some half a dozen casts; but the men became very shy of the wires, because Jimmy Hunter, the keeper, was knocked almost senseless by using, an iron bar he held in his band to remove one of the wires which was in his way. Consequently the experiment was tried in another way. A bar of iron was suspended from the top of the furnace down into the material to a depth of some 10 or 12 feet; to this one wire was attached, and the other to one of the tuyere pipes. The current was kept up continuously for two weeks. The samples of iron produced in this experiment were puddled, with the idea that the electric current would be found to have dispelled the phosphorus; but the results showed no apparent difference from the iron otherwise made.
At
this time, the steam-whistle was an unknown sound in the Lehigh Valley. I had
secretly had made by Lehman, Sr., a brass-founder of Bethlehem, a large
whistle, which measured 8 in. in diameter, and about 1.5 in. in depth of bell;
and when No. 3 was ready, and the whistle had been attached to the boilers and
they were ready to be tested, and the pressure was up to 60 or 70 pounds, I let
her off. The noise startled the whole town and occasioned much laughter. Mrs.
Noah Davis used to tell how she and the women on upper Church street rushed out
of their houses to gather up their children, thinking, as they heard the
unusual sound, that it was the last trump.
During
1849-50 the Crane Co. built furnaces Nos. 4 and 5, 18 ft. in bosh-diameter and
45 ft. high. -To drive these furnaces the most powerful blowing-engine in the
country was erected, with blowing-cylinders 7 ft. and steam-cylinders 34 in. in
diameter (high pressure) and 9 ft. stroke, which would exert with ease a
blast-pressure of 8 to 10 lbs. per sq. in. With the volume of air that could be
delivered, the furnaces were too low to do as well as was expected; so they
were raised to 55 ft. high in 1852, after which the production ranged from 250
to 300 tons each per week. Figs. 2, 6 and 10, showing the lines of furnaces
Nos. 1, 2 and 3 of the Crane Co., were traced from sketches found among the
papers of the late Joshua Hunt, who was connected with the works from 1843 to
1885. The flue shown in No 1 was not used until the hot-blast was erected on
top in 1843. The section of arch shown in No. 2 was built between Nos. 1 and 2
and boilers placed on top when the two engines before mentioned were erected
back of No. 1 in 1850, after which the breast-wheels were abandoned and only
turbines were used, and these only up to 1858, when steam-power was resorted to
exclusively. No. 3 as shown was built with one pier and two arches, one arch
against No. 2, the other against No. 3, on which the boilers and hot-blast were
placed.
As
my friend of nearly half a century's standing, Mr.. John Fritz, of Bethlehem,
truly says in his reminiscences of the pioneer days of iron-making in this
country, the active managers of the iron-works of today, possessed of all the
facilities of telegraph, telephone and railroads, know little of the trials and
tribulations of those arduous early times. It required three whole days to
transact business between us and Philadelphia - two days to go and return by
stage, and one to attend to business. When the roads were bad, it often took us
twelve hours to reach the city.
Up
to 1855 our only means of transportation for coal from Mauch Chunk, and
magnetic ore from New Jersey, was the canal. The hematite ores and limestone
were brought to the works entirely by wagon, the country literally swarming
with teams. We paid in some instances as high as $2.00 per ton for
transportation on some of these ores; and not until 1855, when the Lehigh
Valley railroad was opened, and 1857, when the Catasauqua and Foglesville line
was partly finished, did we begin to have a taste of the labor-saving,
facilities so generally enjoyed today. An immense amount of labor was required
simply to pile up a sufficient amount of coal to run five furnaces during the
four winter months. The unloading of the coal was all done by wheelbarrows; and
the accumulation of our provision commenced in the spring, as soon as navigation
was opened, and continued until the canal was closed, since we had to store not
less than 40,000 tons, in addition to what the furnaces were continually
consuming.. In 1847, with a view of expediting this work, we erected a large
amount of trestling 25 ft. high, and a water-balance near No. 3 furnace, so
that the coal could be unloaded into cars, elevated, and then dumped in this
trestle-work. The first season's experience with this system was not
encouraging. The rains and snows of winter caused the coal to freeze; and it
would come down in great masses, often breaking the legs of the trestles and
crushing the coal, making much waste. After the second season the labor-saving
apparatus was abandoned and the wheelbarrow was again resorted to.
As
already remarked, on leaving home I had not the least idea of presenting this
paper before the Institute; but this providential opportunity being offered I
gladly embrace it, desiring to correct certain misapprehensions and wrong
impressions concerning the great discovery in question, and feeling it my duty
to establish, even at this late day, the claims of my father to the successful
application of the use of anthracite in the production of pig-iron. The facts
given I have from my father's own lips. That he did not assert himself more
emphatically at the time was due to his modesty and to lack of means and
influence to obtain a patent, which was no small undertaking at that time in
Great Britain. Mr. Crane has often received the credit of this useful
discovery. With all due respect to his memory, I must state that he was in no
sense of the word a mechanic or a technical man, but a shrewd business man,
with a faculty for recognizing the merits and promoting, the commercial
utilization of the inventions of others - a faculty, by the way, which is as
essential to industrial progress as the genius of the investigator and
inventor.
Josiah
White's son-in-law, Richard Richardson, in his history of the early development
of the Lehigh Coal and Mine Co. (afterwards changed to the Lehigh Coal and
Navigation Co.), refers to the building of the first furnace by my father for
the Lehigh Crane Iron Co. He gives the history of Mr. Hazard's trip to Wales to
inquire into the results at Yniscedwin and says:
"Mr.
Hazard ordered such machinery as was necessary to be made for the company,
under the direction of George Crane the inventor, and engaged David Thomas, who
was familiar with the process, to take charge of the erection of the works for
the manufacture of iron, and to his faithful and intelligent management much of
the success of the enterprise was due."
It is not reasonable to suppose that Mr. Hazard, an entire stranger to the business, should have taken the responsibility of procuring the necessary machinery and other appliances for the erection of this furnace. The real facts are, that the whole matter was placed in my father's hands, and that, during the four months he remained in Wales after the signing of the contract with Mr. Hazard, he made all arrangements for the entire outfit of the furnace. The blowing-machinery was constructed at the Soho Works, England, and the hot-blasts at Yniscedwin from the same patterns as used there, under the supervision of John Clee, the assistant superintendent, who succeeded my father in the management of the works, while the fire-brick came from the Stourbridge works, England.
Mr.
Swank, the author of that invaluable work, Iron in all Ages, commenting upon
Mr. Richardson's version, says: "We do not hesitate to say that to Mr.
Thomas' management was due the whole of the success of the anthracite-furnaces
built by the Lehigh Crane works." Mr. William Firmstone, another eminent
authority, says: "With the erection of this furnace commenced the era of
higher and larger furnaces and better blast. machinery, with the consequent
improvement in the yield and quality of iron produced." It has never been
claimed that no anthracite pig-iron had been made in this country previous to
1840, but only that the commercial success of this manufacture dated from my
father's work at Yniscedwin in 1837 and at the Crane works, Catasauqua, Pa., in
1840. I have the highest authority for the statement that not so much as 500
tons of anthracite pig-iron were made in this country during the entire
experimental period preceding 1840.
Having
long felt that a clear statement of the above facts was a tribute that I owed
to my venerated father, the first president of the American Institute of Mining
Engineers, I have to the best of my ability now discharged this duty. Thanking
you for your kind attention and patience, which I fear I have greatly taxed -
such being the inevitable result of the host of recollections which rush upon
my memory as I attempt to relate the early experiences of a career of nearly
sixty years in this special work - I close with the lines of the poet Saxe:
"My
growing talk of olden times,
My growing thirst for early news,
My growing apathy to rhymes,
My growing love of easy shoes,
My growing hate of crowds and noise,
My growing fear of taking cold,
All whisper in the plainest voice,
I'm growing old."
Return
to the Crane Iron Works Index Page
About
The Hopkin Thomas Project
Rev. January 2010